1952 Vincent Black Lightning

Monday 26 July 2010

Extension phase 2 complete

The blockwork is now complete and ready to start the roof structure. Joints may not always be mid block, but everything is square and level. took a width measurement at both ends of the plot and there isn't 2mm in it. How chuffed am I?

Picture above shows the supporting wall that will carry the steel beam that forms the backbone of the vaulted ceiling.


This snap shows the front elevation. As you can see, it's going to be nearly all glass door and with two sky lights in the south facing roof, we'll be bathed in light.

Thursday 22 July 2010