1952 Vincent Black Lightning

Thursday 24 June 2010

Extension update.

Finally got a camera sorted so I can post some pictures of the new project in my life. Not very bikey, I admit, but still fun in some ways.

As you can see all the site work is now complete. Foundations done, floor laid, perimeter fence built, drains in and surrounding site leveled and covered with scalpings ready for the patio slabs. Even got a few breeze blocks on standby ready for the build.

This shot shows the prep work to the existing house wall that was damaged when removing the old lean-too. Still patches of render to remove but I only had the power chisel on hire for a weekend and ran out of time.
Steel sections that will bond new to old to be fitted tomorrow and then Saturday will see the first block laid in anger. Be interesting to see how many I can lay in a day. I can work out how long the rest of the block work should take then.
Will post again after the weelend.